HUDSON

The Collings Foundation

THE PROJECT

Site redevelopment for the American Heritage Museum — one of our most distinctive projects, with active historic military equipment moving throughout the site during construction. Our contract totaled over $1.5 million.

  • Drainage structures

  • Erosion controls

  • Excavation of Hudson Road

  • Paving and curbing

  • Retention basins

  • Earth berms

  • 10' emergency overflow spillway excavation

  • Retaining wall system

THE RESULT

A fully redeveloped museum site — new drainage, retention basins, resurfaced roads, earth berms, and a complete retaining wall system, built without interrupting an active living collection.