WENHAM

Wenham Pines

Construction site with a yellow CAT excavator working on a house renovation, with construction materials and scaffolding around the house.

THE PROJECT

Full site package for a new 55+ residential development — 22 new townhomes and two renovated historic units — totaling over $2 million.

  • Erosion control

  • Cuts and fills for roadway and detention basins

  • Con-tech Plate bridge system installation (14' span, 5'7" rise)

  • 917 SF modular block retaining wall

  • Sewer, water, and drainage systems

  • ~3,500 LF of bituminous berm

  • Binder course pavement (2.5" — approx. 6,900 sq. yds.)

Three white downward-pointing arrows stacked vertically on a black background.

IN THE FIELD

A standout element of this project was the installation of a Con-tech Plate bridge system — a single radius arch spanning 14 feet with a 5'7" rise — integrated into the site's roadway and drainage design alongside a 917 SF modular block retaining wall and 3,500 linear feet of bituminous berm.

THE RESULT

A complete, fully serviced residential community — finished roadways, over 6,900 square yards of pavement, a functioning utility network, and a custom bridge system integrated into the landscape.

Construction site with yellow heavy machinery, workers, and new paved road in a residential neighborhood with trees and houses.
Black checkmark icon inside a white circle with a black background.