DUDLEY

Nichols College – Davis Hall Addition

THE PROJECT

Excavation and site work on a steep slope to support a four-story addition to Davis Hall, requiring intricate erosion control throughout.

  • Slope excavation

  • Erosion control and site stabilization

  • Patio hardscape entrance with radius wall and stairs

  • Onsite drainage system

  • Communications infrastructure

  • Sewer and water services

A large black tow truck is parked in front of a brick building with large windows. The truck is carrying a flatbed trailer with several white cars and construction equipment on it. A person is standing near the trailer.
White double downward arrows on a black background.

THE RESULT

A stabilized, excavated site ready for vertical construction with a finished hardscape entrance, integrated drainage, and all utilities in place.

Sidewalk and driveway with patches of dirt and newly laid asphalt leading to a building with a brick exterior and large windows. Trees and residential houses are visible in the background.
Checkmark inside a circle indicating confirmation or approval.